Ridge & Associates, Inc.

Amoco Oil Company: Implementation of new Terminal Automation Systems at several petroleum loading racks (1993 – 1995).

YPF, S.A.: Basic electrical engineering for terminal automation at eleven (11) locations in Argentina (1993).

Marathon Oil Company: Design and construction supervision of electrical controls modification of asphalt terminal (1995).

Marathon Oil Company: Fault current analysis for existing and new electrical system at Hammond, IN Terminal (1997).

Amoco Oil Company: Design and construction of new power substation at Wood River, IL Refinery (1996 – 1997).

NCRA: Facility start-up support for new terminal in McPherson, KS (1997).

Marathon Oil Company: Design of mechanical and electrical for new ethanol blending system to be used as standard at 45 terminals. (1997)

Marathon Oil Company: Design and construction supervision for new fire suppression system at Mt. Prospect, IL (1996 – 1997).

Marathon Oil Company: Design and construction supervision for new vapor combustor units at various sites (1996).

Amoco Oil Company: Electrical design of new rail car unloading facility for asphalt, including pumps, control, and heat tracing at Davenport, IA terminal (1995 – 1996).

TEPPCO: Electrical design for new light products truck loading facility. Project included power and control design.

Marathon Oil Company

Projects have included: Installation of bottom loading facilities for petroleum terminals, additive injection systems, ethanol systems, vapor recovery units, power and control design for light product and asphalt terminals, pipeline communication systems, programming PLC controllers, transmix injection, SAT11 computer installation, various lighting and control systems for terminals, hydraulic analysis and power bill reconciliation for pipelines.

Convenience stores: Evaluation of new equipment, development of facility circuit manager, development of electrical panel for new and remodeled stores, initiated the Green Light energy management program for the Emro and Branded convenience stores, installed credit card communication within the fueling dispenser for Emro, and installed Emro's first unattended fueling system. Also, developed preventive maintenance and safety programs for Marathon and Emro Marketing Subsidiary.

Marathon Pipeline Company

Projects included: Scada System design for crude oil and light projects, new pipeline control station design and construction. Pipeline station power analysis, design of crude oil receipt station at Robinson, IL Refinery.