|
PROJECT
Ship Unloading/Barge Loading/Rail Car Loading/Truck Loading/Tank Storage Terminal (2009)
CLIENT
IC RailMarine Terminals
LOCATION
Convent, LA
SYNOPSIS
This project involved the complete design of a facility to unload
UAN liquid fertilizer from ships in the Mississippi River, store it in
above ground storage tanks, and load it into trucks, rail cars, and
river barges. The facility
included two (2) rail car spots, one (1) truck loading spot, and four
(4) barge loading spots.
PERSONNEL
Larry J. Hoover, P.E.; Katie Erickson; Stan Brown; Mike Harmon; and
Justin Tucker all worked on this project. |